BPD Architecture – Member of the Chartered Institute of Architectural Technologists

BPD Architecture
 
 

BPD Architecture Experts in Architectural Design.

 

Portfolio

Take a look at our previously completed projects, we constantly working on different schemes so if you require information or photographs of something that isn’t shown, please give us a call and we will be able to point you in the right direction.

Also, why not check out our Twitter and Facebook pages(betterplandes) for current ‘work in progress’ shots

Various smaller extensions and plans in ‘Other Projects’ section on page 2 of the portfolio

Bespoke House Remodelling

Bespoke House Remodelling

We were proud to be involved in this fantastic scheme in the Merseyside area completed in Autumn 2011, turning a tired family home into what can only be described as a Grand Design property. We had to work closely with the council planners in this area to be sympathetic to the existing dwelling and surrounding mature properties.

A £500,000 renovation and expansion scheme ensued providing bespoke contemporary living space with a fantastic new family kitchen and dining room, two additional crash pad bedrooms, each with its own separate living quarters, a large home office and a detached three car garage plus external landscaping and security measures to bring this house right into the 21st century.

For:
Private Client
Foxglove Cottage, Bowness on Windermere

Foxglove Cottage, Bowness on Windermere

We were commissioned on this project back in 2008 to provide a 2 storey extension to a listed cottage (Foxglove Cottage) in Bowness on Windermere in the Lake District National Park, a beautiful part of the UK and a tourist hotspot.

The property is used as a holiday let and the owners were looking for increased living space and more usable sleeping arrangements to in turn increase revenue returns. The council approvals and construction stages were all dealt with prior to the busy holiday let periods. The use of local sustainable materials and finishes were required to ensure old met new perfectly.

Planning permission works in a National Park can take much more time to obtain but thankfully this project went smoothly thanks to experience on similar projects and ensuring the correct information was supplied to the governing authority.

Contractors: www.arhjoinery.co.uk

6 New Build Houses, Atherton

6 New Build Houses, Atherton

We were commissioned by Hesketh Bank Property Developers to obtain Planning permission and Building regulations approval for a residential scheme on a piece of former public open space land enclosed on three sides in an urban area in the Wigan Borough. The approval included the creation of a new highway and the diversion of a footpath and the scheme is known as Hillside Court.

We turned what was a tricky site into a £750,000+ property portfolio of 6no. 3 bedroomed family houses surrounding a central courtyard accessed via a private roadway, this scheme was finished in 2009 and we have gone on to provide many further housing scheme designs for the developer.

For:
Hesketh Bank Property Developers
New Build House, Leigh

New Build House, Leigh

A £200,000 3 bed detached house was created in the side garden of an existing house in Leigh, Greater Manchester. This project was completed in 2010 and provided a very good sized family home with open plan living on what was previously the large side garden of the semi detached house seen in the photos.

We were appointed to handle the scheme from initial planning submission to project management completion and this client has now gone on to use our services again for his next, more ambitious self build project – details to come soon (Autumn 2014)

Brunel Street Industrial Units

Brunel Street Industrial Units

This project included the relocation of Holt Brothers (Horwich) Ltd Wrought Iron manufacturers from their old dilapidated building located within a conservation area (Horwich Loco) in Horwich, Bolton.

Two new industrial units were added to the site with an internal car parking courtyard. Certain design features had to be replicated such as recessed false windows and parapet walls due to conservation requirements. Site completed in 2011.

For:
Holt Brothers (Horwich) Limited
 

Contact Us

*

*

*

*

Human Check (CAPTCHA)

captcha

*